{"id":3830,"date":"2025-08-26T12:10:55","date_gmt":"2025-08-26T12:10:55","guid":{"rendered":"https:\/\/landsignal.ai\/blog\/?p=3830"},"modified":"2026-02-17T07:08:28","modified_gmt":"2026-02-17T07:08:28","slug":"entrance-door-requirements-for-secondary-units-in-toronto","status":"publish","type":"post","link":"https:\/\/landsignal.ai\/blog\/entrance-door-requirements-for-secondary-units-in-toronto\/","title":{"rendered":"Entrance Door Requirements for Secondary Units in Toronto"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"3830\" class=\"elementor elementor-3830\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-475b2075 e-flex e-con-boxed e-con e-parent\" data-id=\"475b2075\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-66967b6a elementor-widget elementor-widget-text-editor\" data-id=\"66967b6a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p style=\"text-align: justify;\">In October 2024, Toronto updated its zoning rules for <strong>secondary suite entrances<\/strong>, giving property owners more flexibility and design freedom. These changes make it easier to add a <strong>legal secondary unit<\/strong> while staying compliant with zoning and the Ontario Building Code.<\/p>\r\n\r\n<h2 style=\"text-align: left;\">What Changed in the By-law<\/h2>\r\n<p style=\"text-align: justify;\">Toronto\u2019s Zoning By-law 569-2013 removed clause <strong>150.10.40.1<\/strong> and regulations <strong>150.10.40.1(1)<\/strong> and <strong>150.10.40.1(2)<\/strong>. Previously, these rules restricted where entrances could be placed and what exterior alterations were allowed.<\/p>\r\n<p style=\"text-align: justify;\">Now, the requirements are much simpler and more homeowner-friendly.<\/p>\r\n\r\n<h2 style=\"text-align: left;\">Key Updates for Secondary Suite Entrances<\/h2>\r\n<ul style=\"text-align: justify;\">\r\n \t<li><strong>Front Entrances Allowed<\/strong> \u2192 Secondary suites can now have pedestrian entrances on the <strong>front main wall<\/strong> of a building. This provides flexibility to meet Ontario Building Code requirements for ingress and egress.<\/li>\r\n \t<li><strong>More Location Options<\/strong> \u2192 Entrances can now be located on the <strong>front, side, or rear walls<\/strong> of a home.<\/li>\r\n \t<li><strong>No Limits on Number of Entrances<\/strong> \u2192 Property owners can include <strong>multiple entrances<\/strong> without restrictions.<\/li>\r\n \t<li><strong>Exterior Alterations Permitted<\/strong> \u2192 You can make changes to the building exterior to accommodate a new front entrance for your secondary suite.<\/li>\r\n \t<li><strong>Multiplexes Get More Freedom<\/strong> \u2192 Multiplex properties have no restrictions on the number or placement of entrances.<\/li>\r\n<\/ul>\r\n<p style=\"text-align: justify;\">These updates may appear simple, but they open new design opportunities and create added flexibility for property owners planning secondary units. Knowing how to apply the changes correctly ensures compliance while making the most of the available space.<\/p>\r\n\t\t<div data-elementor-type=\"section\" data-elementor-id=\"1912\" class=\"elementor elementor-1912\" data-elementor-post-type=\"elementor_library\">\n\t\t\t<div class=\"elementor-element elementor-element-a8f9d0a e-flex e-con-boxed e-con e-parent\" data-id=\"a8f9d0a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-c1bd88f e-con-full e-flex e-con e-child\" data-id=\"c1bd88f\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-d8408d6 e-con-full e-flex e-con e-child\" data-id=\"d8408d6\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4f725ea elementor-widget elementor-widget-heading\" data-id=\"4f725ea\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Start Your Project with Confidence<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c605f4a elementor-widget elementor-widget-text-editor\" data-id=\"c605f4a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>At Land Signal, we assist with construction and renovation permits, as well as Garden House and Laneway Suite designs. Let our experts guide you through every step.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-aab80a4 e-con-full e-flex e-con e-child\" data-id=\"aab80a4\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a5caa59 elementor-mobile-align-justify elementor-widget elementor-widget-button\" data-id=\"a5caa59\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/landsignal.ai\/blog\/contact-us\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Free Consultation<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3ee2a46 elementor-mobile-align-justify elementor-widget elementor-widget-button\" data-id=\"3ee2a46\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#form-sec\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Request Free Consultation<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-30a8a35 e-con-full e-flex e-con e-child\" data-id=\"30a8a35\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1950f02 elementor-align-center elementor-widget elementor-widget-lottie\" data-id=\"1950f02\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;source_json&quot;:{&quot;url&quot;:&quot;https:\\\/\\\/landsignal.ai\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/House.json&quot;,&quot;id&quot;:5099,&quot;size&quot;:&quot;&quot;,&quot;alt&quot;:&quot;&quot;,&quot;source&quot;:&quot;library&quot;},&quot;loop&quot;:&quot;yes&quot;,&quot;reverse_animation&quot;:&quot;yes&quot;,&quot;source&quot;:&quot;media_file&quot;,&quot;caption_source&quot;:&quot;none&quot;,&quot;link_to&quot;:&quot;none&quot;,&quot;trigger&quot;:&quot;arriving_to_viewport&quot;,&quot;viewport&quot;:{&quot;unit&quot;:&quot;%&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:{&quot;start&quot;:0,&quot;end&quot;:100}},&quot;play_speed&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:1,&quot;sizes&quot;:[]},&quot;start_point&quot;:{&quot;unit&quot;:&quot;%&quot;,&quot;size&quot;:0,&quot;sizes&quot;:[]},&quot;end_point&quot;:{&quot;unit&quot;:&quot;%&quot;,&quot;size&quot;:100,&quot;sizes&quot;:[]},&quot;renderer&quot;:&quot;svg&quot;}\" data-widget_type=\"lottie.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"e-lottie__container\"><div class=\"e-lottie__animation\"><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\r\n<h2 style=\"text-align: left;\">Front Entrances for Secondary Suites<\/h2>\r\n<p style=\"text-align: justify;\">Toronto\u2019s 2024 zoning update allows <strong>secondary suite entrances on the front main wall<\/strong> of detached and semi-detached houses. This change provides more design flexibility, ensures compliance with the Ontario Building Code, and removes restrictions on the number or location of entrances.<\/p>\r\n\r\n\r\n<figure id=\"attachment_3831\" aria-describedby=\"caption-attachment-3831\" style=\"width: 574px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/landsignal.ai\/blog\/wp-content\/uploads\/2025\/08\/1-1-2.webp\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-3831 size-full\" src=\"https:\/\/landsignal.ai\/blog\/wp-content\/uploads\/2025\/08\/1-1-2.webp\" alt=\"Front Entrances for Secondary Suites\" width=\"574\" height=\"705\" srcset=\"https:\/\/landsignal.ai\/blog\/wp-content\/uploads\/2025\/08\/1-1-2.webp 574w, https:\/\/landsignal.ai\/blog\/wp-content\/uploads\/2025\/08\/1-1-2-244x300.webp 244w\" sizes=\"(max-width: 574px) 100vw, 574px\" \/><\/a><figcaption id=\"caption-attachment-3831\" class=\"wp-caption-text\">Figure 1: New zoning rules allow secondary suites to have entrances on the front main wall of detached or semi-detached homes, with no limit on the number of entrances.<\/figcaption><\/figure>\r\n<h2 style=\"text-align: left;\">Why These Changes Matter<\/h2>\r\n<p style=\"text-align: justify;\">For homeowners and developers, these updates mean:<\/p>\r\n\r\n<ul style=\"text-align: justify;\">\r\n \t<li><strong>More design options<\/strong> when planning a basement apartment, secondary suite, or multiplex.<\/li>\r\n \t<li><strong>Easier compliance<\/strong> with building code and zoning rules.<\/li>\r\n \t<li><strong>Fewer permit delays<\/strong>, since restrictions on entrances have been simplified.<\/li>\r\n<\/ul>\r\n<p style=\"text-align: justify;\"><strong>Example<\/strong>: A homeowner converting their basement into a legal secondary unit can now add a front entrance without applying for special variances.<\/p>\r\n\r\n<h2 style=\"text-align: left;\">How Land Signal Can Help<\/h2>\r\n<p style=\"text-align: justify;\">At <a href=\"https:\/\/landsignal.ai\/\">Land Signal<\/a>, we specialize in turning zoning updates into opportunities. For secondary suites, we:<\/p>\r\n\r\n<ul style=\"text-align: justify;\">\r\n \t<li>Review your property and design plans to confirm compliance.<\/li>\r\n \t<li>Ensure entrances meet both zoning and <a href=\"https:\/\/propertypathways.ca\/ontario-building-code-simplified-what-you-need-to-know\/\" target=\"_blank\" rel=\"noopener\">Ontario Building Code<\/a><strong>.<\/strong><\/li>\r\n \t<li>Manage the entire <strong>permit process<\/strong>, from application to approval.<\/li>\r\n \t<li>Provide <strong>design compliance services<\/strong> for basement units, multiplexes, and home extensions.<\/li>\r\n<\/ul>\r\n<p style=\"text-align: justify;\">Planning costs? Try our <a href=\"https:\/\/landsignal.ai\/blog\/legal-basement-permit-toronto\/\">legal basement permit Toronto<\/a> service along with our <a href=\"https:\/\/landsignal.ai\/blog\/renovation-permit-toronto\/\">renovation cost calculator Toronto<\/a> to see how entrance updates may affect your budget.<\/p>\r\n\r\n<h2 style=\"text-align: left;\">Bottom Line<\/h2>\r\n<p style=\"text-align: justify;\">Toronto\u2019s 2024 zoning update makes adding a secondary suite more straightforward than ever. With fewer restrictions on entrance locations, homeowners gain flexibility to design smarter, more functional spaces.<\/p>\r\n<p style=\"text-align: justify;\">At Land Signal, we help you take advantage of these changes, ensuring your <a href=\"https:\/\/landsignal.ai\/blog\/secondary-suites-toronto\/\">secondary suites Toronto<\/a> permit is approved quickly and your project moves forward with confidence.<\/p>\r\n\r\n<h2 style=\"text-align: left;\">Quick Reference<\/h2>\r\n<ul>\r\n \t<li style=\"text-align: justify;\">Secondary suites in Toronto can now have multiple entrances.<\/li>\r\n \t<li style=\"text-align: justify;\">Entrances may be located on the front, side, or rear walls of a home.<\/li>\r\n \t<li style=\"text-align: justify;\">Exterior changes are permitted to add new entrances.<\/li>\r\n \t<li style=\"text-align: justify;\">No restrictions apply to multiplex entrances.<\/li>\r\n<\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-932fef5 e-flex e-con-boxed e-con e-parent\" data-id=\"932fef5\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3baa5db1 elementor-widget elementor-widget-heading\" data-id=\"3baa5db1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">FAQ<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-695697e7 elementor-widget elementor-widget-accordion\" data-id=\"695697e7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"accordion.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-accordion\">\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-1761\" class=\"elementor-tab-title\" data-tab=\"1\" role=\"button\" aria-controls=\"elementor-tab-content-1761\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon elementor-accordion-icon-left\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon-closed\"><i class=\"fas fa-plus\"><\/i><\/span>\n\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon-opened\"><i class=\"fas fa-minus\"><\/i><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">Does a secondary suite in Toronto need its own separate entrance?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-1761\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"1\" role=\"region\" aria-labelledby=\"elementor-tab-title-1761\"><p style=\"text-align: left;\">Yes \u2014 a legal secondary suite must have its own exterior entrance or a dedicated shared exit that meets Ontario Building Code egress requirements.<\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-1762\" class=\"elementor-tab-title\" data-tab=\"2\" role=\"button\" aria-controls=\"elementor-tab-content-1762\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon elementor-accordion-icon-left\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon-closed\"><i class=\"fas fa-plus\"><\/i><\/span>\n\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon-opened\"><i class=\"fas fa-minus\"><\/i><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">Where can the entrance for a secondary suite be located?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-1762\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"2\" role=\"region\" aria-labelledby=\"elementor-tab-title-1762\"><p style=\"text-align: left;\">Recent Toronto zoning changes now allow secondary suite entrances on the front, side, or rear walls of detached, semi\u2011detached, or townhouse homes, giving more flexibility than earlier rules that restricted front entrances.<\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-accordion-item\">\n\t\t\t\t\t<div id=\"elementor-tab-title-1763\" class=\"elementor-tab-title\" data-tab=\"3\" role=\"button\" aria-controls=\"elementor-tab-content-1763\" aria-expanded=\"false\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon elementor-accordion-icon-left\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon-closed\"><i class=\"fas fa-plus\"><\/i><\/span>\n\t\t\t\t\t\t\t\t<span class=\"elementor-accordion-icon-opened\"><i class=\"fas fa-minus\"><\/i><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-accordion-title\" tabindex=\"0\">What are the minimum door size requirements for a secondary suite entrance?<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div id=\"elementor-tab-content-1763\" class=\"elementor-tab-content elementor-clearfix\" data-tab=\"3\" role=\"region\" aria-labelledby=\"elementor-tab-title-1763\"><p>Under the Ontario Building Code, the entrance door into a dwelling unit (including a secondary suite) must be at least 810\u202fmm wide and 1\u202f980\u202fmm high.<\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>In October 2024, Toronto updated its zoning rules for secondary suite entrances, giving property owners more flexibility and design freedom. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3850,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[6,15],"tags":[],"class_list":["post-3830","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-multiplex-triplex-zoning"],"_links":{"self":[{"href":"https:\/\/landsignal.ai\/blog\/wp-json\/wp\/v2\/posts\/3830","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/landsignal.ai\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/landsignal.ai\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/landsignal.ai\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/landsignal.ai\/blog\/wp-json\/wp\/v2\/comments?post=3830"}],"version-history":[{"count":0,"href":"https:\/\/landsignal.ai\/blog\/wp-json\/wp\/v2\/posts\/3830\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/landsignal.ai\/blog\/wp-json\/wp\/v2\/media\/3850"}],"wp:attachment":[{"href":"https:\/\/landsignal.ai\/blog\/wp-json\/wp\/v2\/media?parent=3830"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/landsignal.ai\/blog\/wp-json\/wp\/v2\/categories?post=3830"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/landsignal.ai\/blog\/wp-json\/wp\/v2\/tags?post=3830"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}