Installing a sign in Toronto involves far more than design and placement. The City enforces its Sign By-law with precision, and many applicants face delays because of missing documents, incorrect drawings, or confusion about sign classifications. These setbacks affect business...

How to Obtain a Sign Permit in Toronto

Content Management Team

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, consectetur adipiscing elit.

How to Obtain a Sign Permit in Toronto: Professional Guide 2026

Installing a sign in Toronto involves far more than design and placement. The City enforces its Sign By-law with precision, and many applicants face delays because of missing documents, incorrect drawings, or confusion about sign classifications. These setbacks affect business owners, property managers, and contractors who rely on timely signage to launch or advertise operations.Unapproved...
How to Obtain a Sign Permit in Toronto

Author

Farnaz Bigdeli
Author Photo LinkedIn

Farnaz Bigdeli, MBA, PMP

Farnaz Bigdeli, MBA, PMP, co-founder of Land Signal, specializes in applying data science and strategic foresight to decode complex building regulations and optimize project profitability.

View editorial process

Reviewed By

Amir M.Khazaneh
Author Photo LinkedIn

Amir M.Khazaneh, P.Eng.

Amir M. Khazaneh, P.Eng., COO/CEO of Land Signal, is a Professional Engineer specializing in construction management and rigorous site supervision to minimize project delays.

View editorial process

Updated On

February 18, 2026

Category

Read Time

4 Mins to Read

Updated on

February 18, 2026

Post Category

Read Time

4 Mins to Read

Installing a sign in Toronto involves far more than design and placement. The City enforces its Sign By-law with precision, and many applicants face delays because of missing documents, incorrect drawings, or confusion about sign classifications. These setbacks affect business owners, property managers, and contractors who rely on timely signage to launch or advertise operations.

Unapproved signage can lead to fines, removal orders, and complications with future property improvements such as building permits or renovation permits. This guide provides an overview of the requirements so applicants can prepare their applications, avoid common mistakes, and secure approval efficiently.

Start Your Project with Confidence

At Land Signal, we assist with construction and renovation permits, as well as Garden House and Laneway Suite designs. Let our experts guide you through every step.

Understanding the Toronto Sign By-law

Toronto’s Sign By-law (Chapter 694 of the Municipal Code) governs:

  • Sign sizes and dimensions
  • Heights and placement on properties
  • Illumination and lighting standards

The first step is determining your sign type:

  • First Party Sign: Advertises goods or services offered at the same property.
  • Third Party Sign: Advertises goods or services not provided on the property. These require additional documents and undergo more rigorous review.

This distinction determines which forms, drawings, and approvals are required.

First Party Sign

A sign that advertises goods or services offered at the same property.

Third Party Sign

A sign that advertises goods or services not provided on the property.

These require additional engineering documents and more rigorous review. Understanding this distinction determines which forms, drawings, and approvals are required.

Obtain a Sign Permit in Toronto

Required Documents and Drawings

1. Application Form
First Party Signs: Application for a Permit to Construct or Demolish

  • Third Party Signs: Third Party Sign Permit Application
  • If the applicant is not the property owner, a signed owner authorization letter may be required.

2. Technical Drawings
All applications must include scaled, signed, and dated drawings showing:

  • Sign dimensions
  • Materials and structural details
  • Mounting or ground installation method
  • Electrical details if illuminated
  • Exact location on the building or property

3. Engineering or Architectural Stamps may be required when:

  • Ground signs exceed 7.5 m in height
  • Projecting signs weigh more than 115 kg
  • Roof signs have any face larger than 10 m²
  • Signs are attached to a parapet wall

4. Additional Documents (Case Specific) which may be required:

  • Tree Declaration (for ground signs)
  • Commitment to General Review by an engineer or architect
  • Site Plan by Ontario Land Surveyor (OLS) for Third Party signs, showing property lines, setbacks, distances to intersections, nearby signs, and zoning districts

Submitting Your Application

  • Submit all documents in PDF format by email to [email protected].
  • Review times:
    • Non-heritage properties → 3 business days
    • Heritage properties → not eligible for 3-day turnaround
    • Applications with 4+ signs → up to ten business days
  •  

Permit Fees

  • Fees vary by sign type and size.
    • Fees are between $34.87 and $41.81 per square metre of sign face area
    • Minimum fee: approx. $309.30
  • Fees payable by credit card over the phone (416-392-8000).
  • Application review begins only after payment is received.

Tracking Your Application

  • Fewer than 3 signs → 3 business days
  • More than 3 signs → 10 business days

Applicants can monitor progress by:

  • Contacting the assigned examiner
  • Using the City’s online building permit status page

How LandSignal Helps

Completing a Toronto sign permit application requires accuracy, technical preparation, and knowledge of the Sign By-law. LandSignal supports applicants by matching you with qualified professionals who can:

  • Review sign classification and applicable sign bylaw requirements
  • Coordinate professional drawings and engineering stamp
  • Prepare supporting documents
  • Submit complete packages on behalf of clients
  • Track applications through every review stage

This is valuable for property owners managing multiple approvals, such as building permits or commercial renovation projects.

Conclusion

Securing a sign permit in Toronto requires strict adherence to the Sign By-law, complete technical drawings, correct forms, and timely fee payment. When prepared correctly, the process is predictable and can proceed through either standard or expedited review.
The two most critical success factors are:

  1. Accurate documentation
  2. Complete details of the proposed sign

By preparing thoroughly and seeking qualified support when needed, property owners can protect their investment, maintain compliance, and avoid costly delays.

FAQ

Most permanent commercial signs do. Only small temporary signs that meet City exemptions may not require a permit.

Yes, but they must provide a signed authorization letter from the property owner.

They verify structural safety when signs involve load-bearing elements, elevated installations, or electrical components.

Standard processing takes about ten business days. Fast Track approval takes two days when all requirements are met.

Farnaz Bigdeli

Farnaz Bigdeli, MBA, PMP is a Co-Founder at Land Signal and a Strategy and Innovation expert. She leverages her extensive background in Data Science, Architecture, and Business to simplify complex building codes and transform regulatory challenges into predictable, profitable strategies for the construction industry.

Get In Touch

"*" indicates required fields

Plan Smarter. Build Easier.

Whether you’re exploring an addition, a suite, or a full redevelopment, Land Signal provides zoning clarity and expert planning support tailored to your property.